PIP STS02465 PDF

$108.00

Augered Cast-in-Place Piles Installation Specification [Editorial Correction]

Published by Publication Date Number of Pages
PIP 07/01/2022 28
PDF FormatPDF FormatMulti-User-AccessMulti-User AccessPrintablePrintableOnline downloadOnline Download
Category:

Description

PIP STS02465 – Augered Cast-in-Place Piles Installation Specification [Editorial Correction]

This Practice describes requirements for furnishing and installing augered cast-in-place (ACIP) piles also called continuous flight auger (CFA) piles. Test piles, pile load tests and pile integrity testing are included and shall be executed in accordance with this specification when required.

Product Details

Published:
07/01/2022
Number of Pages:
28
File Size:
1 file , 640 KB
Note:
This product is unavailable in Ukraine, Russia, Belarus