SALE
PIP ELSGS07 – Design and Fabrication of High-Resistance Grounding System (2.4kV to 15kV) [Complete Revision]
This Practice describes the minimum requirements for design, fabrication, testing, and documentation of three-phase, high-resistance grounding systems for use on medium voltage delta or wye systems installed in nonclassified areas.
Product Details
- Published:
- 05/01/2019
- Number of Pages:
- 17
- File Size:
- 1 file , 220 KB
- Note:
- This product is unavailable in Ukraine, Russia, Belarus