PIP CVS02100 – Site Preparation, Excavation, and Backfill Specification [Technical Revision]
This Practice describes the requirements for excavation, placement, inspection, and management of materials during the site preparation, excavation, and backfill phase of a construction project.
Product Details
Published:
12/01/2021
Number of Pages:
19
File Size:
1 file , 380 KB
Note:
This product is unavailable in Ukraine, Russia, Belarus