NACE SP0207 PDF

Original price was: $79.00.Current price is: $47.00.

Performing Close-Interval Potential Surveys and DC Surface Potential Gradient Surveys on Buried or Submerged Metallic Pipelines

Published by Publication Date Number of Pages
NACE 03/10/2007 51
PDF FormatPDF FormatMulti-User-AccessMulti-User AccessPrintablePrintableOnline downloadOnline Download
Category:

NACE SP0207 – Performing Close-Interval Potential Surveys and DC Surface Potential Gradient Surveys on Buried or Submerged Metallic Pipelines

This standard practice presents procedures for performing close-interval direct current (DC) structure-to-electrolyte potential surveys, DC surface potential gradient surveys, and hybrid surveys such as trailing-wire direct current voltage gradient (DCVG) surveys or intensive measurement surveys, on buried or submerged metallic pipelines. This standard is maintained by Task Group 279.

Product Details

Published:
03/10/2007
Number of Pages:
51
File Size:
1 file , 610 KB
Note:
This product is unavailable in Ukraine, Russia, Belarus