IEC 63132-4 Ed. 1.0 b PDF

Original price was: $259.00.Current price is: $155.00.

Guidance for installation procedures and tolerances of hydroelectric machines – Part 4: Vertical Kaplan or propeller turbines

Published by Publication Date Number of Pages
IEC 04/28/2020 74
PDF FormatPDF FormatMulti-User-AccessMulti-User AccessPrintablePrintableOnline downloadOnline Download
Category:

IEC 63132-4 Ed. 1.0 b – Guidance for installation procedures and tolerances of hydroelectric machines – Part 4: Vertical Kaplan or propeller turbines

IEC 63132-4:2020 The purpose of this this part of IEC 63132 is to establish, in a general way, suitable procedures and tolerances for the installation of a vertical Kaplan or propeller turbine. This document presents a typical assembly and whenever the word “turbine” is used in this document, it refers to a vertical Kaplan or propeller turbine. There are many possible ways to assemble a unit. The size of the machine, design of the machine, layout of the powerhouse or delivery schedule of the components are some of the elements that could result in additional steps, the elimination of some steps and/or assembly sequences.

Product Details

Edition:
1.0
Published:
04/28/2020
Number of Pages:
74
File Size:
1 file , 2.3 MB
Note:
This product is unavailable in Ukraine, Russia, Belarus