IEC 62439-5 Ed. 1.0 en:2010 PDF

Original price was: $214.00.Current price is: $128.00.

Industrial communication networks – High availability automation networks – Part 5: Beacon Redundancy Protocol (BRP)
standard by International Electrotechnical Commission, 02/26/2010

PDF FormatPDF FormatMulti-User-AccessMulti-User AccessPrintablePrintableOnline downloadOnline Download
Category:

IEC 62439-5:2010(E) is applicable to high-availability automation networks based on the ISO/IEC 8802-3 (IEEE 802.3) (Ethernet) technology. It specifies a redundancy protocol that is based on the duplication of the network, the redundancy protocol being executed within the end nodes, as opposed to a redundancy protocol built in the switches. Fast error detection is provided by two beacon nodes, the switchover decision is taken in every node individually. The cross-network connection capability enables single attached end nodes to be connected on either of the two networks. It cancels and replaces IEC 62439 published in 2008 and constitutes a technical revision. It includes the following significant technical changes with respect to IEC 62439 (2008):
– adding a calculation method for RSTP (rapid spanning tree protocol, IEEE 802.1Q),
– adding two new redundancy protocols: HSR (High-availability Seamless Redundancy) and DRP (Distributed Redundancy Protocol),
– moving former Clauses 1 to 4 (introduction, definitions, general aspects) and the Annexes (taxonomy, availability calculation) to IEC 62439-1, which serves now as a base for the other documents,
– moving Clause 5 (MRP) to IEC 62439-2 with minor editorial changes,
– moving Clause 6 (PRP) was to IEC 62439-3 with minor editorial changes,
– moving Clause 7 (CRP) was to IEC 62439-4 with minor editorial changes, and
– moving Clause 8 (BRP) was to IEC 62439-5 with minor editorial changes,
– adding a method to calculate the maximum recovery time of RSTP in a restricted configuration (ring) to IEC 62439-1 as Clause 8,
– adding specifications of the HSR (High-availability Seamless Redundancy) protocol, which shares the principles of PRP to IEC 62439-3 as Clause 5, and
– introducing the DRP protocol as IEC 62439-6.

This publication is to be read in conjunction with IEC 62439-1:2010.

Product Details

Edition:
1.0
Published:
02/26/2010
Number of Pages:
41
File Size:
1 file , 1 MB
Note:
This product is unavailable in Ukraine, Russia, Belarus