IEC 62117 Ed. 1.0 b – Nuclear reactor instrumentation – Pressurized light water reactors (PWR) – Monitoring adequate cooling within the core during cold shutdown
Gives requirements for instrumentation to monitor core cooling for safe operation of PWRs during cold shutdown operations when the coolant temperature is below 100 °C. Summarizes good international practices to be used when designing new or upgrading existing PWR core cooling monitors.
Product Details
Edition:
1.0
Published:
12/10/1999
Number of Pages:
51
File Size:
1 file , 250 KB
Note:
This product is unavailable in Ukraine, Russia, Belarus