ASME B30.18 PDF

$35.00

Stacker Cranes (Top or Under Running Bridge, Multiple Girder with Top or Under Running Trolley Hoist)

Published by Publication Date Number of Pages
ASME 09/30/2021 64
PDF FormatPDF FormatMulti-User-AccessMulti-User AccessPrintablePrintableOnline downloadOnline Download
Category:

Description

ASME B30.18 – Stacker Cranes (Top or Under Running Bridge, Multiple Girder with Top or Under Running Trolley Hoist)

B30.18 applies to the construction, installation, operation, inspection, and maintenance of hand-powered and power-driven overhead and gantry cranes that have a top or under running multiple girder bridge with a vertically guided carriage, with or without a top or under running trolley. The requirements included in this volume also apply to stacker cranes having the same fundamental characteristics, such as cantilever gantry and semi-gantry stacker cranes.

Product Details

Published:
09/30/2021
ISBN(s):
9780791874653
ANSI:
ANSI Approved
Number of Pages:
38
File Size:
1 file , 460 KB
Note:
This product is unavailable in Ukraine, Russia, Belarus