ASME PTC 47-2006 PDF
$99.00
Performance Test Code on INtegrated Gasification Combined Cycle Power Generation Plants
standard by ASME International, 01/22/2007
Description
This Code covers a defined range of primary fuel characteristics, but is limited to combined-cycle, power-generation systems using gas and steam turbines. This Code defines the boundaries of the overall IGCC power plant to encompass three major plant sections–the air separation unit (ASU, for oxygen-blown gasifiers or plants that use nitrogen), the gasification process (including gas cleanup), and the power block. Tests conducted by this Code determine the quantity and quality of fuel gas by its flow rate, temperature, pressure, composition, heating value, and its content of contaminants. Contaminants are compounds that are potentially deleterious to the gas turbine and power block in general, or are precursors to stack emissions. Contaminants to be measured are sodium (Na), potassium (K), vanadium (V), lead (Pb), calcium (Ca), barium (Ba), manganese (Mn), phosphorus (P), sulfur compounds (H2S and COS), nitrogen compounds (HCN and NH3), chlorine compound (HCI), and particulate matter. Recommendations are included for the following in pretest agreements: testing procedures, types of instruments, methods of measurement, method of calculation, and contents of test report. Regulatory compliance testing of IGCC power plants is not covered by this Code.
Product Details
- Published:
- 01/22/2007
- ISBN(s):
- 0791830195
- ANSI:
- ANSI Approved
- Number of Pages:
- 100
- File Size:
- 1 file , 2.1 MB
- Product Code(s):
- C0680Q, C0680Q, C0680Q
- Note:
- This product is unavailable in Ukraine, Russia, Belarus