API TR 934-G PDF

$98.00

Design, Fabrication, Operational Effects, Inspection, Assessment, and Repair of Coke Drums and Peripheral Components in Delayed Coking Units, First Edition

Published by Publication Date Number of Pages
API 04/01/2016 57
PDF FormatPDF FormatMulti-User-AccessMulti-User AccessPrintablePrintableOnline downloadOnline Download
Category:

Description

API TR 934-G – Design, Fabrication, Operational Effects, Inspection, Assessment, and Repair of Coke Drums and Peripheral Components in Delayed Coking Units, First Edition

This technical report includes information and guidance on the practices used by industry practitioners on the design, fabrication, operation, inspection, assessment and repair of coke drums and peripheral components in delayed coking units. The guidance is general and does not reflect specific details associated with a design offered by licensors of delayed coking technology, or inspection tools, operating devices/components, repairs techniques, and/or engineering assessments offered by contractors. For details associated with the design offered by a licensor or services provided by contractors, the licensor or contractor should be consulted for guidance and recommendations for their design details and operating guidance. This document is a technical report and as such, provides generally used practices in industry and is not an API Recommended Practice for coke drums in delayed coking units.

Product Details

Edition:
1st
Published:
04/01/2016
Number of Pages:
57
File Size:
1 file , 4.2 MB
Product Code(s):
C934G01, C934G01, C934G01
Note:
This product is unavailable in Russia, Cuba, Syria, North Korea, Ukraine, Belarus, Iran